Home · Process & Industrial Services · Projects

Alliant Techsystems, Inc. Munitions Facility

ENERCON provided an engineering scoping study and capital cost estimate for the design and installation of a new NOx abatement system at an operating munitions manufacturing facility in order to bring the facility into environmental compliance. Highlights of the project included:

  • Evaluation of multiple technologies
  • Evaluation of present value life cycle costs for each technology
  • Technology recommendation
  • NOx continuous emission monitoring
  • Design criteria
  • Scope of work definition
  • Equipment pricing
  • Piping line list
  • Tie-in list
  • Process flow diagram
  • General arrangement drawings
  • Capital cost estimate
  • Evaluation of geotechnical data
  • Procurement and subcontracting plan
  • Risk matrices
  • Potential scope reductions

TOP