
Research Center License Decommissioning Project
ENERCON was chosen by a University in New York as the facilitator for their Research Center License Decommissioning process and NRC license termination. ENERCON was responsible for development of the Historical Site Assessment. Based on that document ENERCON developed the Characterization Plan and implemented the requirements of the plan. Based on the results of the […]

Emergency Feedwater Turbine Controls Upgrade
ENERCON completed an analog to digital upgrade of the speed control system for the safety related Nuclear Emergency Feedwater (EFW) Turbine. The original Terry Turbine analog control system was obsolete and subject to maintenance challenges including difficulty in obtaining spare and replacement parts. The upgraded control system includes a modern, digital, commercial-grade dedicated Woodward governor […]

Circulating Water Pump Digital Relay Upgrades
ENERCON recently completed a plant design modification that upgraded the existing electromechanical (analog) protection relays for two 9000 HP, 6.9 kV Circulating Water Pump (CWP) motors to new solid-state (digital) relays. The objective was to harden the CWP motor protection circuits by implementing modern solid-state electronic equipment and eliminating legacy electromechanical devices that can lead […]