ENERCON transmission teams utilized our depth of experience to evaluate multiple combinations of structure materials, environmental conditions, and construction methods to achieve the most economical design.
- Routing study of 3mi x 6mi corridor
- Rebuild of 1.04 miles of existing 69 kV circuit
- Rebuilt as double circuit, monopole structures utilizing back-to-back post insulators
- Transfer existing 1351 ACSR conductor and add a new parallel 1351 ACSR circuit with OPGW onto the structure configuration
- Rebuild of 1.65 of an additional 69 kV circuit
- Designed line split and double circuit loop
- Existing 636 ACR conductor transferred to new structures
- Installation of new 1351 AAC conductor and 3/8 EHS shield on new circuit