ENERCON transmission teams utilized our depth of experience to evaluate multiple combinations of structure materials, environmental conditions, and construction methods to achieve the most economical design.

  • Routing study of 3mi x 6mi corridor
  • Rebuild of 1.04 miles of existing 69 kV circuit
  • Rebuilt as double circuit, monopole structures utilizing back-to-back post insulators
  • Transfer existing 1351 ACSR conductor and add a new parallel 1351 ACSR circuit with OPGW onto the structure configuration
  • Rebuild of 1.65 of an additional 69 kV circuit
  • Designed line split and double circuit loop
  • Existing 636 ACR conductor transferred to new structures
  • Installation of new 1351 AAC conductor and 3/8 EHS shield on new circuit