ENERCON implemented new technologies in our designs and construction methods to work within the confines of existing constraints while minimizing outages on an existing system.
- Replacement of 152 structures on existing 18.5 mile 69kV transmission line
- Line constructed utilizing direct embedded, LD steel structures
- Complete detailed design
- Review of manufacturer calculations and shop drawings
- Developed environmental and road permits
- Provided material bid evaluations assistance
- Developed construction drawings and documents
- Assisted with construction bid evaluation
- Provided engineering assistance during construction circuit