ENERCON implemented new technologies in our designs and construction methods to work within the confines of existing constraints while minimizing outages on an existing system.

  • Replacement of 152 structures on existing 18.5 mile 69kV transmission line
  • Line constructed utilizing direct embedded, LD steel structures
  • Complete detailed design
  • Review of manufacturer calculations and shop drawings
  • Developed environmental and road permits
  • Provided material bid evaluations assistance
  • Developed construction drawings and documents
  • Assisted with construction bid evaluation
  • Provided engineering assistance during construction circuit
Engage with Enercon

Let’s empower your next project.